Skip to Content

Pricing, MOQ & Lead Times

Summary

  • Samples: 10 units (usually quick ship)
  • Pre-production: 100 units
  • Production: MOQ depends on configuration
  • Lead times: Vary by sensor and lens availability. Confirmed per quote.

What drives price

  • Image sensor choice and availability
  • Lens type, FoV, coatings, filters (IR-cut / IR-pass)
  • Interface: USB UVC, MIPI CSI-2 (Raspberry Pi, NVIDIA Jetson), DVP/SPI
  • Assembly method: CSP vs COB, active alignment (AA)
  • Calibration profile and firmware requirements
  • Mechanical format: rigid, FPC, rigid-flex, connector type

What drives lead time

  • Sensor and lens stock at build start
  • Need for custom optics or AA
  • Firmware/driver tuning scope
  • Compliance documents and test reports requested
  • Batch size and parallel lines available

Volume pricing and breaks

We quote graduated pricing for production volumes and include price-break tiers on each quotation. Sample pricing follows list prices where applicable.

Typical order flow

  1. Share requirements → Project request form
  2. Technical review and BOM proposal
  3. Quote with price breaks and lead time
  4. Sample build → pre-production → production
  5. Logistics, compliance docs, and ongoing supply

FAQs

What are your typical MOQs?

Samples: 10 units. Pre-production: 100 units. Production MOQ depends on configuration.

What are the lead times?

They depend on sensor/lens availability and build options. We confirm the exact timeline in your quote.

Do you offer volume price breaks?

Yes. We supply tiered pricing on quotations and list breaks when applicable.

Which interfaces do you support?

USB UVC, MIPI CSI-2 (including Raspberry Pi and NVIDIA Jetson), and DVP/SPI.

How do I get an exact quote?

Use the project request form or book a meeting.

Terms, warranty, and compliance

See Terms for contractual details, warranty, and legal notices.